• Michelle from European
    Chris, these parts have passed our test in one time and thanks for your strong support, and i will send PO to you later, please check it.
Contact Person : Ms Chris Tang
Phone Number : 86-13828785172
WhatsApp : +8613828785172

High Performance Industrial Equipment Parts Powder Metallurgy Tooling

Place of Origin CHINA
Brand Name no
Certification ISO9001, TS16949,IECQQC080000
Model Number no
Minimum Order Quantity 1000PCS
Price 0.1-1.00USD
Packaging Details NATURAL PACKAGE
Delivery Time 20-30 DAYS
Payment Terms T/T, , Western Union, D/P
Supply Ability 100,000,000PCS
Product Details
Material Stainless Steel, Iron,brass, Etc Color Natural Or According To Your Requests
Quality High Precision And High Quality, ISO9001/TS16949 Process Powder Metallurgy
Surface Treatment Polishing, Oiled, Oxidizing Black Tolerance ±0.02~±0.05mm
Packing Carton Packaging With Bubble Or According To Your Requests OEM OR NOT OEM
Inspection 100% Inspection Application Mechanical Equipment
High Light

atm machine parts

,

water pump accessories

Leave a Message
Product Description

Customized Washing Machines Parts, Mechanical Equipment Parts

 

FAQ

1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
Customer Inquiry →Engineering Meeting →Cost Analysis →Sales Analysis →Quote to Customer
1-3 Work Days Only
Submit RFQ with complete commercial terms
2, What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
For small quantity, we could provide T/T, T/T commission will be added to the order.
For the big one, T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.

 

Company Advantage

1.Quality policy:

Zero defecets, doing things to be best in one time

Keeping improve and never stop pursuing perfect attitde

reducing cost, and contine improve the compition of products

2.Quality goal:

quality rate can achieve 98%

quality rate of half-finished products is 99%

the failure cost is <2%

3.Our all of products are suit ROHS standard, green parts, without any pollution.

 

 

Service:

1, 100% inspection before shipment.

2, Satisfied packing, carton, wooden case, pallet,or according to your requirement.

3, Samples are within 15 days after the receipt of the deposit. production will be finished about 30-40 days after samples confirma

process powder metallurgy
applied software pro-e, CAD, PDF
material iron alloy , stainless steel, copper
surface finish black, PVD, polishing, sandblasting
tolerance precision ±0.02~0.05mm
quality system 100% inspection before shipment
dimensions as per customer's requests
samples qty 5-10 pcs(for free)
certification ISO 9001, TS 16949, IECQQC080000
packgae plastic bag and carton or as customer's requests
lead time base on the qty of order(usually 40-45 days)

 

WORKSHOP

 

High Performance Industrial Equipment Parts  Powder Metallurgy Tooling 0

 

INSPECTION EQUIPMENT

High Performance Industrial Equipment Parts  Powder Metallurgy Tooling 1

 

Packing Requirements:

neutral packing , carbon packing, and as according to your requirements

High Performance Industrial Equipment Parts  Powder Metallurgy Tooling 2

 

Certifications:

● ISO 9001:2009 ● ISO/TS 16949:2009 ● IECQ QC 080000

High Performance Industrial Equipment Parts  Powder Metallurgy Tooling 3

 


If you are interested in lock button, please send me 2D or 3D drawings, and then we will evaluate them and offer you a nice price