• Michelle from European
    Chris, these parts have passed our test in one time and thanks for your strong support, and i will send PO to you later, please check it.
Contact Person : Ms Chris Tang
Phone Number : 86-13828785172
WhatsApp : +8613828785172

High Performance Powdered Metal Parts Manufacturers ±0.02~±0.05 Mm Tolerance

Place of Origin CHINA
Brand Name no
Certification ISO9001, TS16949,IECQQC080000
Model Number no
Minimum Order Quantity 10000PCS
Price 0.1~0.5USD
Packaging Details NATURAL PACKAGE
Delivery Time 20-30 DAYS
Payment Terms T/T, , Western Union, D/P
Supply Ability 100,000,000PCS
Product Details
Material Stainless Steel, Iron,brass, Ceramic Color Natural
Quality High Precision And High Quality, ISO9001/TS16949 Process Metal Injection Molding,powder Metallurgy
Surface Treatment Polishing, Oiled, Zinc-plating, Oxidizing Black Tolerance ±0.02~±0.05mm
Packing Carton Packaging With Bubble Or According To Your Requests OEM OR NOT OEM
Inspection 100% Inspection Application Face Mask Machine
High Light

powder metal parts

,

powder metallurgy components

Leave a Message
Product Description

Customized Rotary Coin Spare Parts Used In Game Machine With High Quality

 

What’s the PM technology?

Powder metallurgy (PM), sometimes referred to as powdered metal sintering, is a process for manufacturing metal parts by heating compacted metal powders just below their melting points. In other words, PM is a metal shaping process that creates near-net parts from powdered metal. Sometimes, the products, manufactured by PM, are known as sintered products.

PM Technology Advantage/Features

It suit to mass production and have strong supply capacity, without environmental pollution. It suit to produce complex with porous, and its post treatment is less ,especially gear, one-time compacting, no cutting, and greatly reduce the production cost.

 

Company Advantage

1, Quality policy:

Zero defecets, doing things to be best in one time

Keeping improve and never stop pursuing perfect attitde

reducing cost, and contine improve the compition of products

2, Quality goal:

quality rate can achieve 98%

quality rate of half-finished products is 99%

the failure cost is <2%

3, Our all of products are suit ROHS standard, green parts, without any pollution.

FAQ

1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
Customer Inquiry →Engineering Meeting →Cost Analysis →Sales Analysis →Quote to Customer
1-3 Work Days Only
Submit RFQ with complete commercial terms
2, What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
For small quantity, we could provide T/T, T/T commission will be added to the order.
For the big one, T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.

 

 

Service:

1, 100% inspection before shipment.

2, Satisfied packing, carton, wooden case, pallet,or according to your requirement.

3, Samples are within 15 days after the receipt of the deposit. production will be finished about 30-40 days after samples confirma

process powder metallurgy
applied software pro-e, CAD, PDF
material iron alloy , stainless steel, copper. ceramic, tungsten alloy
surface finish black, plating, PVD, polishing, sandblasting
tolerance precision ±0.02~0.05mm
quality system 100% inspection before shipment
dimensions as per customer's requests
samples qty 5-10 pcs(for free)
certification ISO 9001, TS 16949, IECQQC080000
packgae plastic bag and carton or as customer's requests
lead time base on the qty of order(usually 40-45 days)
 

WORKSHOP

 

High Performance Powdered Metal Parts Manufacturers ±0.02~±0.05 Mm Tolerance 0

 

INSPECTION EQUIPMENT

High Performance Powdered Metal Parts Manufacturers ±0.02~±0.05 Mm Tolerance 1

 

Packing Requirements:

neutral packing , carbon packing, and as according to your requirements

High Performance Powdered Metal Parts Manufacturers ±0.02~±0.05 Mm Tolerance 2

 

 

Certifications:

● ISO 9001:2009 ● ISO/TS 16949:2009 ● IECQ QC 080000

High Performance Powdered Metal Parts Manufacturers ±0.02~±0.05 Mm Tolerance 3

 

 

If you are interested in lock button, please send me 2D or 3D drawings, and then we will evaluate them and offer you a nice price